Latest News:

Find out about the Boiler Upgrade Scheme and save up to £9,000

How does the Boiler Upgrade Scheme work?

The Boiler Upgrade Scheme (BUS) is a UK government grant scheme to help homeowners / small non-domestic buildings replace fossil fuel heating (like gas or oil boilers) with low-carbon alternatives—mainly heat pumps. Here’s how it works, who’s eligible, and what you need to know.


How the Boiler Upgrade Scheme Works

1. What does the grant provide?

  • £7,500 towards an air source heat pump (ASHP).
  • £7,500 towards a ground source heat pump (GSHP) (including water-source or shared ground-loop systems).
  • £5,000 towards a biomass boiler.

2. Who applies / How the grant is claimed

  • You (the homeowner or property owner) don’t apply directly — we, the installer applies on your behalf.
  • Installers must be MCS-certified (Microgeneration Certification Scheme) to be eligible. Total Renewable Solutions are fully certified.
  • Once the installer applies, Ofgem (the scheme administrator) issues a voucher which effectively reduces your installation cost.

3. System requirements

  • The heat pump system should have a maximum capacity of 45 kWth if it’s for a single property.
  • For shared ground-loop systems (e.g., in a development), the total system capacity can go up to 300 kWth under BUS.
  • There is a requirement for performance: for example, many eligible units must meet a minimum seasonal coefficient of performance (SCOP) (for instance, ≥ 2.8 in some cases).
  • The system must provide both space heating and hot water, not just one of those.

4. Eligibility (Who can use it?)

  • The scheme is available in England and Wales.
  • It’s for replacing fossil fuel heating systems, e.g., gas, oil, or electric boiler or heating.
  • You can only get one grant per property.
  • You need a valid Energy Performance Certificate (EPC), issued within the last 10 years.
  • Hybrid systems (e.g., a combination of a heat pump + a gas boiler) are not eligible under BUS.

5. Voucher validity and use

  • Once issued, the voucher is valid for a limited time. The exact duration depends on the technology:
  • For air source heat pumps or biomass boilers, it’s 3 months.
  • (For other types, like ground source, it may differ — always check with your installer / Ofgem.)
  • The installation has to be completed before you redeem the voucher.
  • After installation, the installer redeems the voucher by submitting proof of installation to Ofgem, and the grant amount is deducted from what you pay.

6. Scheme budget and timing

  • The scheme is managed by Ofgem, and there’s a limited budget.
  • According to Ofgem’s guidance (latest), the scheme is open to “property owners” for applications made after 8 May 2024, under their current guidance version. Ofgem
  • There have been further funding allocations to make sure more vouchers are available. Ofgem

7. Other considerations

  • The grant is a capital grant, not a loan — you don’t need to pay it back.
  • The scheme excludes some types of heat pumps (for example, “hot-water only” heat pumps).
  • The scheme aims to help decarbonise heating in line with the UK’s net-zero targets.